|
| |
Plants and Configuration |
|
Add New Plant
Because a Plant is also an Entity, its establishment is achieved by following the instructions
above in this SHORTCUT SECTION under Entities: Add New Entity. For a Plant, the
chosen Class must be Engineering Service Areas and the chosen Purpose, will most likely
need to be either Heat Plant or Chiller. After creating such a Plant Entity, you should check
that there will now be access to a Config link. To do this, point to the Quick Tab Asset Details
link and in the drop-down menu click the Facilities List link followed by the Show Entities link.
In the Facilities List so obtained, on the line for the new Entity, just after its Purpose, there will
be a Config link which allows the Plant to be configured. Note: Having created a Plant
enables its functional output of heating, chilling or pumping etc, to be allocated to other
Entities through a Configuration. However, it is still necessary to have a Meter which records
the energy input required to run the Plant.
Plant Configuration
To add, view, edit, close or delete a Plant Configuration, point to the Quick Tab Asset Details
link and in the drop-down menu click the Facilities List link followed by the Show Entities link.
In the Facilities List so obtained, on the line for the required Entity, just after its Purpose, click
the Config link. From there on, proceed using the appropriate instruction above in this
SHORTCUT SECTION under Energy/Utility Maps and Configuration, as if the Plant were a
Meter.
|
|